Technical Information
Updated, detailed Project Description
Project Description Updated May 2010
SMART Project Mitigation Measures
Mitigation Measures from FEIR and FSEIR
Vehicle Technology Assessment Report
Stations Summary Information
Working Paper No. 5
Detailed Project Design Options
October 2003
Attention: This document was created in 2003 for use in preliminary engineering and environmental clearance for the SMART project. Information contained herein is subject to change.
Working Paper No. 5 -- Detailed Project Design Options
General Notes, Legend and Abbreviations
Plan and Profile
Bridges and Culverts
Maintenance Facility
Signaling System
Track Improvements
Tunnels
Appendix A: Bicycle/Pedestrian Path Considerations
Appendix B: Recommended Bicycle/Pedestrian Pathway Routing by Segment
Appendix C: Track Inspection Report
Appendix D: Bridge Inspection Report
Appendix E: Grade Crossing Photographs and Upgrade Descriptions
Appendix F: Capital Cost Estimate Backup
Appendix G: Operating and Maintenance Cost Estimate Backup
Hydrology and Water Quality Assessment Report
Preliminary Engineering Design Review and Recommendations Report
SMART Corridor Condition Report Update
These files are in Portable Document Format (PDF). To view them, you will need Adobe Acrobat Reader. If this program is not already installed on your PC, you can download it free of charge from Adobe Systems' website.

